Our Current Project 

Project Title Year

1) Proposed Underpinning Works on House 7 & 9, Jalan 5B/7, Section 5, Bandar Baru Bangi, Selangor

2021 (Ongoing)
2)  Rancangan Tebatan Banjir Lembangan Sungai Muar,Johor - Pembinaan Pintasan Tanjung Olak Di Sungai Muar Dan Kerja – Kerja Berkaitan (Reka Dan Bina) 2021 (Ongoing)

3) Proposed S-Wall System for Slope Protection for Cadangan Pembangunan Perumahan Di Atas Pt 42845 (Lot Asal Pt 41301 & Pt 41321), Mukim Tanjung Dua Belas, Daerah Kuala Langat,Selangor

2021 (Completed)
4)  Cadangan Pembangunan Perumahan Taman Srikandi di atas Lot 3953, Mukim Telok Panglima Garang, Daerah Kuala Langat, Selangor 2021 (Completed)
5) Proposed Underpinning Work to Single Storey Terrace House at Kuala Kangsar, Perak Darul Ridzuan 2021 (Completed)

6) Proposed Underpinning Works on House No 14 & 16, Jalan 5B/7, section 5, Bandar Baru Bangi, Selangor

2021 (Completed)
7) Proposed Underpinning 8 Point for Salak Tinggi 2020 (Completed)
8) Cadangan Pembangunan di atas Lot 527, Mukim Bertam, Daerah melaka Tengah, Melaka 2020 (Completed)
9) Underpinning works to 1 unit of Semi-D 2020 (Completed)

10) Underpinning Works to Generator Building atNEG

2019 (Completed)
11) Proposed Underpinning for Jenjarom 4 Point car pouch 2019 (Completed)

12) Proposed Underpinning for double story 1 unit at jalan pipit , jenjarom

2019 (Completed)
13)  Proposed underpining for jenjarom 24 point car pouch, 2019 (Completed)
14) A Proposed Underpinning for Steripack Factory 2019 (Completed)

15) Proposed Underpinning for Eco sanctuary Bangalow

2019 (Completed)
16) ROPOSED REINSTATEMENT WORKS TO THE DISTRESSED HOUSE AT No. 110 AT JALAN BIRAI U8/69, BUKIT JELUTONG, SHAH ALAM, and SELANGOR 2018 (Completed)
17) Pelangi Semenyih Phase 2, Mukim Semenyih, Daerah Hulu Langat, Selangor Darul Ehsan 2018 (Completed)
18) Proposed Underpining for 1 unit houses at bukit changang Banting 2018 (Completed)

19) Proposed Underpinning to factory slab at Prai for South Island Plastic Sdn Bhd.

2018 (Completed)
20) Proposed Underpining for TNB wall structure at PPU Cyberjaya 3, Persiaran Semarak 2018 (Completed)

21) Project River of Life (FASA 2): Cadangan Penambahbaikan Dan Pengindahan Kawasan Yang Merangkumi Nodus-Nodus Berikut:                

1. Pakej  3A- Kawasan sungai Gombak Dari Jalan Sultan Ismail Ke kawasan Tiong Nam 

2. Pakej 3B - Kawasan sungai Gombak Dari Jalan Sultan Ismail Ke Jalan Parlimen Dan Sungai Klang Dari Masjid Jamek Ke Dang Wangi

2018 (Completed)